Advertisement
Telegram ads for your business · TCA Media
Friday, 27 November 2026UzbekistanRUUZEN
Advertisement
Telegram ads for your business · TCA Media
CBU ratesUSD12 002.10▲ 14.21EUR13 166.30▲ 51.55RUB146.02▲ 0.61CNY1 802.06▲ 6.31KZT26.21▲ 0.04GBP15 721.55▲ 65.37As of 27.11.2026
Economy

Railway Line Connects Tashkent with Parkent

A new electrified railway line has connected Tashkent with Parkent: the journey takes 1 hour 13 minutes, and a ticket costs 10,000 soums.

20 Nov, 13:37Read in Russian

The construction of the 24-kilometer Baytkurgan–Parkent line cost 535.4 billion soums. Along the section, a station, three bridges, an overpass, 77 water drainage structures, and 16 crossings were built. Electric train services were launched in September 2026.

The total length of the Tashkent–Parkent route is 57.6 km. It is served by a six-car EP3D train costing 124 billion soums, which accommodates 586 passengers and reaches speeds of up to 120 km/h. The route is designed to transport up to 2,000 people per day and up to 300,000 per year. According to the press service of the president, a ticket is 2.5 times cheaper than the average taxi ride.

On November 20, Shavkat Mirziyoyev traveled to Parkent District on this electric train. The carriages feature climate control, USB ports, free Wi-Fi, electronic displays, video surveillance, and bicycle mounts. For passengers with disabilities, lifts and designated spaces are provided.

At Parkent Station, Mirziyoyev instructed officials to continue developing railway infrastructure, improve service quality, and expand passenger amenities. Tasks were also set to enhance transport efficiency and improve the areas along the line.

Advertisement
Telegram ads for your business · TCA Media